Lighting Information and Inventory



There is a Standard House Plot that cosists of general front light and a 2-color full-stage overhead wash. (See Lightplot drawing)

QUANTITY

DESCRIPTION

LOCATION

 

ETC SOURCE FOUR BODIES (lamped at 575 watts)

10

19 degree lens

 

48

26 degree lens

 

48

36 degree lens

 

6

50 degree lens

 

FRESNELS

40

Century & Altman 1kW 8"

 

PAR 64

28

Altman Par 64 1kW

 

CYCLORAMA FIXTURES

6

Colortran 1kW - 3 Cell

9th Electric

6

Altman R 40 600W - 3 Cell

Floor

SPOTLIGHTS

2

Strong Minuet

FOH Catwalk

LIGHTING CONTROL

1

ETC Expression-2X
(remote to Middle of House & SM location Stage Right)

Booth

1

ETC Element

Booth

1

ETCNet Remote Video Interface with Focus Unit & dual Monitors

SM Location DSR

DIMMERS

280

2.4K ETC Sensor Dimmers

 

 

Download pdfs:

Sat, Dec 2
Hold for Ken JC, reh

Sun, Dec 3
Hold for Ken JC

Sun, Dec 3
LJSC Set-up

Mon, Dec 4
La Jolla Symphony %26 Chorus

Mon, Dec 4
LJSC Rehearsal

Tue, Dec 5
Mandeville Closed

Wed, Dec 6
La Jolla Symphony %26 Chorus

Wed, Dec 6
LJSC Rehearsal

Thu, Dec 7
Mandeville Closed

Fri, Dec 8
La Jolla Symphony %26 Chorus

Fri, Dec 8
LJSC Rehearsal

Sat, Dec 9
La Jolla Symphony %26 Chorus

Sat, Dec 9
LJSC Performance

Sun, Dec 10
La Jolla Symphony %26 Chorus

Sun, Dec 10
LJSC Performance

Thu, Dec 14
Staff Meeting, 186

Sat, Dec 16
San Diego Ballet

Sun, Dec 17
San Diego Ballet

Mon, Dec 18
San Diego Ballet

Tue, Dec 19
San Diego Ballet

Wed, Dec 20
San Diego Ballet

Thu, Dec 21
San Diego Ballet

Fri, Dec 22
San Diego Ballet

Sat, Dec 23
San Diego Ballet

Mon, Dec 25
Christmas

Tue, Dec 26
FM CONSTRUCTION

Tue, Dec 26
Campus Closure

Wed, Dec 27
Campus Closure

Wed, Dec 27
FM CONSTRUCTION

Thu, Dec 28
FM CONSTRUCTION

Thu, Dec 28
Campus Closure

Fri, Dec 29
FM CONSTRUCTION

Fri, Dec 29
Campus Closure

Sat, Dec 30
FM CONSTRUCTION

Sat, Dec 30
Campus Closure

Sun, Dec 31
FM CONSTRUCTION