Line Set Schedule



All battens are dead hung from the structural steal. There are no moveable line sets. There is limited access from catwalks above (see stage section). Legs #1 & #2 are hung on tracks, and can be drawn to the SR and SL Walls. There are narrow leg panels, also on track, which can be used to trim the CYC opening.  There is a full stage black scrim available upon request.

LINESET FROM PL TRIM DESCRIPTION/
HOUSE HANG
NOTES DESCRIPTION
  -2'-0" 24'-6" Symphony #1 UNAVAILABLE Permanent Lighting
  -0'-3" 21'-0" House Teaser UNAVAILABLE Permanent
1 0'-0" 24'-6" House Curtain UNAVAILABLE Permanent
2 2'-2" 24'-6" Electric #1    
3 3'-2" 24'-6" Electric #2    
4 4'-10" 24'-6" Symphony #2 UNAVAILABLE Permanent Lighting
5 5'-7" 21'-0" Border #1   3'H x 50'W w/fullness
6 6'-3" 24'-6" Projection Screen IMMOBILE 19' H x 38' W
7 6'-11" 24'-6" Legs #1 (on Track)   24'H x 16'W w/fullness
8 7'-10" 24'-6" Symphony #3 UNAVAILABLE Permanent Lighting
9 9'-4" 24'-6" Electric #3    
10 10'-10" 24'-6" Electric #4    
11 12'-7" 24'-6" Symphony #4 UNAVAILABLE Permanent Lighting
12 13'-5" 21'-0" Border #2   3'H x 50' W w/fullness
13 13'-11" 24'-6" Mid-Stage Traveler IMMOBILE 24' H x 25' W w/fullness
14 15'-5" 24'-6" Electric #5    
15 16'10" 24'-6" Electric #6    
16 18'-3" 24'-6" Symphony #5 UNAVAILABLE Permanent Lighting
17 20'-7" 24'-6"

Legs #2 (on Track)
Electric #7

  24'H x 16'W w/fullness
Shared Pipe
18 21'-6" 24'-6" Scenery Pipe #1   Soft Goods or Scenery Only
19 22'-2" 24'-6" Electric #8    
20 24'-0" 24'-6" Border #3    
21 25'-0" 24'-6" Scenery Pipe #2    
22 26'-4" 24'-6" Electric #9   Cyc Lights
23 27'-4" 24'-6"  Scenery Pipe #3    w/Traveler Track
24 28'-3" 24'-6" Upstage Traveler IMMOBILE  
25 29'-10" 24'-6" White Seamless Muslin Cyclorama   24'H x 55' W
 w/Traveler Track

Download pdf:

Sat, Sep 1
FM CONSTRUCTION

Sun, Sep 2
FM CONSTRUCTION

Mon, Sep 3
Labor Day

Tue, Sep 4
FM CONSTRUCTION

Wed, Sep 5
FM CONSTRUCTION

Thu, Sep 6
FM CONSTRUCTION

Fri, Sep 7
FM CONSTRUCTION

Sat, Sep 8
FM CONSTRUCTION

Sun, Sep 9
FM CONSTRUCTION

Mon, Sep 10
FM CONSTRUCTION

Tue, Sep 11
FM CONSTRUCTION

Wed, Sep 12
FM CONSTRUCTION

Thu, Sep 13
FM CONSTRUCTION

Thu, Sep 13
Staff Meeting, 186

Fri, Sep 14
FM CONSTRUCTION

Sat, Sep 15
FM CONSTRUCTION

Sun, Sep 16
FM CONSTRUCTION

Mon, Sep 17
FM CONSTRUCTION

Tue, Sep 18
FM CONSTRUCTION

Wed, Sep 19
FM CONSTRUCTION

Thu, Sep 20
FM CONSTRUCTION

Fri, Sep 21
FM CONSTRUCTION

Sat, Sep 22
FM CONSTRUCTION

Sun, Sep 23
FM CONSTRUCTION

Mon, Sep 24
FM CONSTRUCTION

Tue, Sep 25
FM CONSTRUCTION

Wed, Sep 26
FM CONSTRUCTION

Thu, Sep 27
FM CONSTRUCTION

Fri, Sep 28
FM CONSTRUCTION

Sat, Sep 29
FM CONSTRUCTION

Sun, Sep 30
FM CONSTRUCTION