General Measurements



Stage floor is black painted masonite floor covering on a sprung fir foundation. Use of stage screws is permitted, upon approval, and holes must be patched and painted upon completion of the show. The line sets are deadhung from the structural steel, with limited catwalk access from above. An 8' Stage Extension is available upon request

 

PROSCENIUM WIDTH/OPENING 42'-0"
PROSCENIUM HEIGHT 21'-0"

FRONT EDGE OF STAGE TO PLASTER LINE
(without Stage Extension)

5'-0"
PLASTER LINE TO BACK WALL (Acoustic Panels)
30'-0"

GRID HEIGHT (to bottom of steel)

25'-0"
AVERAGE BATTEN LENGTH 60'-0"
BORDER TRIM 21'-0"
WING SPACE PAST LEGS 12'-0" Approx
SIDE WALL-TO -SIDE WALL 100'-0"
MINIMAL DIMENSIONS FOR BACKDROP 24'-6" x 40'
Sat, Dec 2
Hold for Ken JC, reh

Sun, Dec 3
Hold for Ken JC

Sun, Dec 3
LJSC Set-up

Mon, Dec 4
La Jolla Symphony %26 Chorus

Mon, Dec 4
LJSC Rehearsal

Tue, Dec 5
Mandeville Closed

Wed, Dec 6
La Jolla Symphony %26 Chorus

Wed, Dec 6
LJSC Rehearsal

Thu, Dec 7
Mandeville Closed

Fri, Dec 8
La Jolla Symphony %26 Chorus

Fri, Dec 8
LJSC Rehearsal

Sat, Dec 9
La Jolla Symphony %26 Chorus

Sat, Dec 9
LJSC Performance

Sun, Dec 10
La Jolla Symphony %26 Chorus

Sun, Dec 10
LJSC Performance

Thu, Dec 14
Staff Meeting, 186

Sat, Dec 16
San Diego Ballet

Sun, Dec 17
San Diego Ballet

Mon, Dec 18
San Diego Ballet

Tue, Dec 19
San Diego Ballet

Wed, Dec 20
San Diego Ballet

Thu, Dec 21
San Diego Ballet

Fri, Dec 22
San Diego Ballet

Sat, Dec 23
San Diego Ballet

Mon, Dec 25
Christmas

Tue, Dec 26
FM CONSTRUCTION

Tue, Dec 26
Campus Closure

Wed, Dec 27
Campus Closure

Wed, Dec 27
FM CONSTRUCTION

Thu, Dec 28
FM CONSTRUCTION

Thu, Dec 28
Campus Closure

Fri, Dec 29
FM CONSTRUCTION

Fri, Dec 29
Campus Closure

Sat, Dec 30
FM CONSTRUCTION

Sat, Dec 30
Campus Closure

Sun, Dec 31
FM CONSTRUCTION