General Measurements



Stage floor is black painted masonite floor covering on a sprung fir foundation. Use of stage screws is permitted, upon approval, and holes must be patched and painted upon completion of the show. The line sets are deadhung from the structural steel, with limited catwalk access from above. An 8' Stage Extension is available upon request

 

PROSCENIUM WIDTH/OPENING 42'-0"
PROSCENIUM HEIGHT 21'-0"

FRONT EDGE OF STAGE TO PLASTER LINE
(without Stage Extension)

5'-0"
PLASTER LINE TO BACK WALL (Acoustic Panels)
30'-0"

GRID HEIGHT (to bottom of steel)

25'-0"
AVERAGE BATTEN LENGTH 60'-0"
BORDER TRIM 21'-0"
WING SPACE PAST LEGS 12'-0" Approx
SIDE WALL-TO -SIDE WALL 100'-0"
MINIMAL DIMENSIONS FOR BACKDROP 24'-6" x 40'
Thu, Nov 1
LJSC - Salon, onstage MAN

Fri, Nov 2
La Jolla Symphony %26 Chorus

Fri, Nov 2
LJSC Rehearsal

Sat, Nov 3
La Jolla Symphony %26 Chorus

Sat, Nov 3
LJSC Performance

Sun, Nov 4
La Jolla Symphony %26 Chorus

Sun, Nov 4
Daylight Savings Time Ends

Sun, Nov 4
LJSC Performance

Mon, Nov 5
AP David Rousseve/REALITY - Load-in

Tue, Nov 6
AP David Rousseve/REALITY - Load-in

Tue, Nov 6
Election Day

Wed, Nov 7
AP David Rousseve/REALITY - Load-in

Thu, Nov 8
AP David Rousseve/REALITY - Rehearsals

Thu, Nov 8
Staff Meeting, 186

Fri, Nov 9
AP David Rousseve/REALITY - Perf

Fri, Nov 9
AP David Rousseve/REALITY - Perf

Sat, Nov 10
Mandeville Closed / Dark

Sun, Nov 11
Mandeville Closed / Dark

Sun, Nov 11
Veteran's Day

Sun, Nov 11
Veteran's Day

Thu, Nov 22
Mandeville Closed / Dark

Thu, Nov 22
Thanksgiving

Fri, Nov 23
UCSD Holiday

Fri, Nov 23
Mandeville Closed / Dark

Sat, Nov 24
Mandeville Closed / Dark

Sun, Nov 25
Mandeville Closed / Dark

Thu, Nov 29
Gospel Choir

Thu, Nov 29
Gospel Choir